Monorail and Lightrail
Monorail and Lightrail
"In Monorail and Lightrail we Preliminary structural design of Guideway Beam viaduct as per international standards. We completed Kerala monorail and Mauritius light rail transit."
Client : Afcons Infrastructure Limited
Project Description
Kozikode Section:>
- Total Guideway Length =14.2 km ( fully elevated )
- Number of stations = 15 No ( elevated )
- Total Guideway Length =22.537 km ( fully elevated )
- Number of stations = 19 No ( elevated )
- 2 Depots at end of each section
- Preliminary structural design of Guideway Beam viaduct as per international standards using MIDAS software
- Development of General Arrangement with continuous spans for the full alignment
- Development of Design Basis report for the project
- Preparation of BOQ and price estimations
Client : Afcons Infrastructure Limited
Project Description
- Total 26Kms of alignment including Viaduct, At‐Grade and Ramp
- 19 nos of stations including at grade and elevated stations
- 1 depot structure
- 52 kms of Track structure including Ballasted track, Ballastless Track and Embedded Track
- Preliminary structural design of Viaduct including superstructure, substructure and foundation as per international standards using MIDAS software
- Preliminary structural design Stations structure
- Preliminary structural design Depot structure
- Preliminary structural design Ballastless, Ballasted & Embedded track structure
- Preparation of BOQ and price estimations
Client : Innova Technologies and Las Vegas Monorail Authority
Project Description
- Total Guideway Length =3 km ( fully elevated )
- Number of stations = 2 No ( elevated )
- Preliminary structural design of Viaduct including superstructure, substructure and foundation as per international standards using MIDAS software
- Preliminary structural design Stations structure
- Preliminary structural design Depot structure
- Preliminary structural design Ballastless, Ballasted & Embedded track structure
- Preparation of BOQ and price estimations
Client : Innova Technologies and National authority for Tunnels(Egypt)
Project Description
NCC Section:>
- Total Guideway Length =52 km ( fully elevated )
- Number of stations = 22 No ( elevated )
- 1 Depots at end of each section
- Total Guideway Length =42 km ( fully elevated )
- Number of stations = 12 No ( elevated )
- 1 Depots at end of each section
- Preliminary structural design of Viaduct including superstructure, substructure and foundation as per international standards using MIDAS software
- Preliminary structural design Stations structure
- Preliminary structural design Depot structure
- Preliminary structural design Ballastless, Ballasted & Embedded track structure
- Preparation of BOQ and price estimations