"In ballastless we provide service for design, supply, installation, testing and commissioning. Under this category we completed the following project like Hyderabad metro, Rapid metro, RVNL tunnel, Lucknow metro and Kochi metro."

Client : LARSEN & TOUBRO Ltd
Project :    Hyderabad Metro Ltd
Project Description

Design, supply, installation, testing and commissioning of 72 Kms of Elevated Metro in city of Hyderabad

Services by SCPL.
  • Design of Ballastless track and review of existing design.
  • Value Engineering of existing design and change of design and drawings for reduction of reinforcement.

Building in Construction

Client :    ETF, France and IL&FS Ltd
Project : Rapid Metro‐ Ph 2
Project Description

Design, supply, installation, testing and commissioning of 15 Kms of Elevated Metro in city of Gurgaon

Services by SCPL.
  • Design of Ballastless track for elevated viaduct
  • Design of Depot track ( Pit track, Column track, Embedded track )
  • Design of track turnouts
  • Rail structure interaction study to determine rail fracture stresses

Building in Construction

Client :    CONTINENTAL ENGINEERING CORPORATION LIMITED
Project : New Broad Gauge Railway Line ‐South Central Railway, India (RVNL)
Project Description

Construction of Roadbed including construction of two Tunnels from with ballastless track and earthwork in Formation, Major and Minor Bridges covering Kadapa and Nellore Districts of Andhra Pradesh

Services by SCPL.
  • Preparation of technical documents as part of technical submission for tender submission.
  • Preliminary design & BOQ for Track Slab design including transition slab design.

Building in Construction

Client :    KALPAATRU POWER TRANSMISSION LIMITED
Project : Lucknow Metro Rail Corporation –LKT‐5 (RVNL)Lucknow Metro Rail Corporation –LKT‐5
Project Description

Supply, Installation, Testing and commissioning of Ballastless Track of Standard Gauge, of North‐South Corridor in elevated and underground section along with Ballasted/Ballastless Tracks in Transport Nagar Depot of Lucknow Metro Phase I A Project.

Services by SCPL.
  • Preparation of technical documents as part of technical submission for tender submission
  • Preliminary design & BOQ for Track Plinth design.

Building in Construction

Client :    KALPAATRU POWER TRANSMISSION LIMITED
Project : Kochi Metro Rail Corporation –KT4
Project Description

Design, supply, installation, testing and commissioning of Ballastless track of standard gauge in elevated section of Aluva to Petta corridor of Kochi Metro Rail.

Services by SCPL.
  • Preparation of technical documents as part of technical submission for tender submission.
  • Preliminary design & BOQ for Track Plinth design.